Putzmeister is a world-renowned brand, it produces and sells all kinds of concrete pumps, industrial pumps and their auxiliary equipment. It not only has a fairly mature marketing network and channel resources in the world, but also masters world-class concrete machinery technology, as well as top brand resources with international recognition, so its product price is higher, in this case, if a certain hydraulic pump or pump parts are broken, how to repair it and continue to use it? This article provides you with some solutions for different failure scenarios.
1. Mixing shaft rotation failure
The concrete pump truck is driven by a hydraulic motor to drive the mixing shaft to feed the commercial concrete cylinder by secondary mixing of the commercial concrete. Once you find that the mixing shaft does not rotate or the speed drops significantly, you should immediately check whether the mixing hydraulic motor is working normally, whether the pressure of the mixing hydraulic system is within a reasonable range, or appropriately accelerate the speed of the mixing shaft.
2. Blockage and elimination of conveying pipes
Most of the parts where the concrete pump truck conveying pipe is blocked are in the cone pipe and bend that are easy to vibrate. You can beat it with a small iron rod along the conveying pipeline, if the sound is crisp and the conveying sound is rustling, it means that there is no blockage; If the sound is dull and the transmitted sound is harsh, it is a blockage. At this time, the conveying pressure gradually increases, the pumping action stops, the hopper material level does not drop, the pipeline outlet end does not discharge, the pump vibrates, and the pipeline mixes with strong vibration and displacement. The reverse pump is operable, but it becomes blocked after turning into the positive pump. If the commercial concrete boom pump truck conveying pipe is slightly blocked, then the blockage should be identified first, and then the commercial concrete should be loosened by shaking and hammer knocking, and the positive pump and reverse pump operations should be repeated, and the commercial concrete should be gradually sucked out into the hopper, and then it should be pumped after remixing. If the blockage problem cannot be eliminated through these measures, then the method of dismantling the pipe should be adopted to drain the commercial concrete blockage, and the conveyor pipe of the blockage can be taken over only after it is removed to avoid re-blockage.
3. Replace it in time
The life of each hydraulic pump or pump part is limited, and you should pay attention to regular accuracy inspection, regular inspection, regular maintenance, routine maintenance, as well as equipment cooling system maintenance and equipment lubrication system maintenance. If there is a fault that cannot be solved by the above methods, please be sure to replace it in time! we are ELEPHANT FLUID POWER, we provide Putzmeister affordable alternative hydraulic pumps and pump parts, the quality and specifications are compatible with the original concrete pump truck, no need to pay the premium of the big brand like the original, the lower price will give you unexpected surprises!
If you need relevant technical parts support, please contact us!
putzmeister concrete pump manual pdf
putzmeister concrete pump specifications
putzmeister concrete pump for sale
putzmeister ergonic 2.0 manual
putzmeister concrete pump spare parts
putzmeister service center
putzmeister line pump
putzmeister parts catalog